IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Systems administrator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Automate accounts, backups and patches.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Document, inventory and alerts.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Incidents, outages and on-call.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Install, cable and touch hardware.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Permissions, security and difficult users.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Decide what patches and what waits.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Automate accounts, backups and patches
  • Document, inventory and alerts
  • Incidents, outages and on-call
  • Install, cable and touch hardware
  • Permissions, security and difficult users
  • Decide what patches and what waits
  • sysadmin
  • administrador de sistemas
  • sistemas linux

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2522

Analyse my job

Jobs with similar scores

  1. 281Hearing aid technician24%
  2. 282Job insertion technician24%
  3. 283Radiation therapist24%
  4. 285Urban planner24%
  5. 286Allergist23%
  6. 287Anthropologist23%