IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Tailor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pattern, measures and the fitting.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cut, tack and the shoulder that will not hang.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, mark and the client who loses weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Buttonholes, lining and the hand finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The groom, the deadline and not rushing the hem.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hang on the body, and not leaving a high shoulder.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • take measures
  • patterns
  • tack
  • buttonholes
  • tailor fittings
  • linings
  • hem
  • shoulder

Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531

Analyse my job

Jobs with similar scores

  1. 281Hearing aid technician24%
  2. 282Job insertion technician24%
  3. 283Radiation therapist24%
  4. 285Urban planner24%
  5. 286Allergist23%
  6. 287Anthropologist23%