IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Textile engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, weaves and piece QC.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, looms and the warp break.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Supplier, cotton and the sustainability card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Finishes, shrinkage and fastness tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The brand, the deadline and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Ten thousand metres the same, and not hiding the bad yardage.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dye recipes
  • weaves
  • looms
  • colour fastness
  • shrinkage
  • piece card
  • warp
  • textile finishes

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 281Hearing aid technician24%
  2. 282Job insertion technician24%
  3. 283Radiation therapist24%
  4. 285Urban planner24%
  5. 286Allergist23%
  6. 287Anthropologist23%