Automation index
How much of a Surveyor’s job can AI already do?
A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surveyor
24%
AI can already do 24% of this job.
#284 / 633
View rankingSurveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process stations, GNSS and drawings.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Reports, volumes and deliverables.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Measure in the field, stake and set out.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Coordinate with works and the site authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Read the ground when the model lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Owning a 3 cm error.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Process stations, GNSS and drawings
- Reports, volumes and deliverables
- Measure in the field, stake and set out
- Read the ground when the model lies
- Owning a 3 cm error
- topografo
- surveyor
- aparejador topografia
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165
IS WORK OVER?
Well driller
19%
#534 / 633
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113