Automation index
How much of a Swimming coach’s job can AI already do?
A split comes earlier. Swimming the set without drowning in load do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Swimming coach
19%
AI can already do 19% of this job.
#596 / 753
View rankingSwimming coach
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sets, splits and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pool, the stroke and the one who stops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Meet, the start and the one who blows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Shoulder, load and not rushing the taper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Parents, the clock and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Swim the set, and not drowning in load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- sets
- splits
- stroke
- taper
- the start
- the pool
- the clock
- water load
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149