IS WORK OVER?

Automation index

How much of a Swimming coach’s job can AI already do?

A split comes earlier. Swimming the set without drowning in load do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Swimming coach

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sets, splits and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pool, the stroke and the one who stops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Meet, the start and the one who blows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Shoulder, load and not rushing the taper.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Parents, the clock and not humiliating.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Swim the set, and not drowning in load.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sets
  • splits
  • stroke
  • taper
  • the start
  • the pool
  • the clock
  • water load

Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 593Cabinetmaker19%
  2. 594Residential youth worker19%
  3. 595Embryologist19%
  4. 597Tennis coach19%
  5. 598Bodyguard19%
  6. 599Stucco artist19%