IS WORK OVER?

Automation index

How much of a Switchboard operator’s job can AI already do?

A switchboard comes earlier. Putting the call through without hanging up on the one who waits do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Switchboard operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Board, destinations and the shift.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The call, the one who is out and the message.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Emergencies, the anger and not losing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Directory, changes and not putting through wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the queues and not hanging up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Put it through, and not hanging up on the one who waits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switchboard
  • destinations
  • messages
  • directory
  • call queues
  • emergencies
  • telephony shifts
  • extension changes

Sources for this job· O*NET 43-2021.00· ESCO/ISCO 4223

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 217Grants officer27%
  2. 218Ombudsman officer27%
  3. 219Dairy technician27%
  4. 221Telemarketer27%
  5. 222Treasurer27%
  6. 223Trader27%