Automation index
How much of a Switchboard operator’s job can AI already do?
A switchboard comes earlier. Putting the call through without hanging up on the one who waits do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Switchboard operator
27%
AI can already do 27% of this job.
#187 / 623
View rankingSwitchboard operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Board, destinations and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the one who is out and the message.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Emergencies, the anger and not losing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Directory, changes and not putting through wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the queues and not hanging up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Put it through, and not hanging up on the one who waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switchboard
- destinations
- messages
- directory
- call queues
- emergencies
- telephony shifts
- extension changes
Sources for this job· O*NET 43-2021.00· ESCO/ISCO 4223
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142