Automation index
How much of a Switchboard operator’s job can AI already do?
A switchboard comes earlier. Putting the call through without hanging up on the one who waits do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Switchboard operator
27%
AI can already do 27% of this job.
#187 / 623
View rankingSwitchboard operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Board, destinations and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the one who is out and the message.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Emergencies, the anger and not losing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Directory, changes and not putting through wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the queues and not hanging up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Put it through, and not hanging up on the one who waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switchboard
- destinations
- messages
- directory
- call queues
- emergencies
- telephony shifts
- extension changes
Sources for this job· O*NET 43-2021.00· ESCO/ISCO 4223
IS WORK OVER?
Well driller
19%
#529 / 623
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113