Automation index
Can AI do the work of a Systems administrator?
A playbook and a disk graph come earlier. Bringing a server up at 4 a.m. and talking to the user do not.
It also does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Systems administrator
27%
AI or a robot can already do 27% of this job.
#68 / 103
View rankingSystems administrator
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Automate accounts, backups and patches.EstimateNo public source pins this saving. It is an estimate of the method. | 20% | 45% | +9 |
Document, inventory and alerts.EstimateNo public source pins this saving. It is an estimate of the method. | 18% | 40% | +7.2 |
Incidents, outages and on-call.EstimateNo public source pins this saving. It is an estimate of the method. | 18% | 18% | +3.2 |
Install, cable and touch hardware.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 15% | +2.4 |
Permissions, security and difficult users.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 18% | +2.5 |
Decide what patches and what waits.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- Automate accounts, backups and patches
- Document, inventory and alerts
- Incidents, outages and on-call
- Install, cable and touch hardware
- Permissions, security and difficult users
- Decide what patches and what waits
- sysadmin
- administrador de sistemas
- sistemas linux
Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2522
IS WORK OVER?
Mason
15%
#98 / 103
View rankingMason
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source pins this saving. It is an estimate of the method. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112