IS WORK OVER?

Automation index

How much of a Table official’s job can AI already do?

A scoresheet comes earlier. Clock, fouls and not wrecking the result do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Table official

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheet, clock and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fouls, the warning and the one who argues.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Timeout, the scoreboard and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The referee, the table and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The crowd, the shove and keeping calm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A clean result, and the sheet signed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • scoresheets
  • clock
  • fouls
  • timeouts
  • scoreboard
  • the table
  • protocol
  • warnings

Sources for this job· O*NET 27-2023.00· ESCO/ISCO 3422

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 343EV charger installer22%
  2. 344Social integrator22%
  3. 345Banquet manager22%
  4. 347Radio host22%
  5. 348Olive-oil miller22%
  6. 349Special-education teacher22%