IS WORK OVER?

Automation index

How much of a Table official’s job can AI already do?

A scoresheet comes earlier. Clock, fouls and not wrecking the result do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Table official

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheet, clock and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fouls, the warning and the one who argues.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Timeout, the scoreboard and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The referee, the table and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The crowd, the shove and keeping calm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A clean result, and the sheet signed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • scoresheets
  • clock
  • fouls
  • timeouts
  • scoreboard
  • the table
  • protocol
  • warnings

Sources for this job· O*NET 27-2023.00· ESCO/ISCO 3422

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 343EV charger installer22%
  2. 344Social integrator22%
  3. 345Banquet manager22%
  4. 347Radio host22%
  5. 348Olive-oil miller22%
  6. 349Special-education teacher22%