Automation index
How much of a Tactical analyst’s job can AI already do?
A clip comes earlier. The manager using it, and it not being noise, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tactical analyst
27%
AI can already do 27% of this job.
#137 / 733
View rankingTactical analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Video, tags and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Opponent, patterns and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Preview, the dressing room and not drowning them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Live, the tablet and the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The manager, the ego and not contradicting in public.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is used, and not being noise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tag video
- opponent patterns
- preview
- bench tablet
- tactical reports
- dressing room
- changes
- data noise
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142