Automation index
How much of a Tactical analyst’s job can AI already do?
A clip comes earlier. The manager using it, and it not being noise, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tactical analyst
27%
AI can already do 27% of this job.
#132 / 623
View rankingTactical analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Video, tags and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Opponent, patterns and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Preview, the dressing room and not drowning them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Live, the tablet and the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The manager, the ego and not contradicting in public.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is used, and not being noise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tag video
- opponent patterns
- preview
- bench tablet
- tactical reports
- dressing room
- changes
- data noise
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Electrical engineer
25%
#236 / 623
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151