Automation index
How much of a Tactical analyst’s job can AI already do?
A clip comes earlier. The manager using it, and it not being noise, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tactical analyst
27%
AI can already do 27% of this job.
#132 / 623
View rankingTactical analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Video, tags and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Opponent, patterns and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Preview, the dressing room and not drowning them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Live, the tablet and the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The manager, the ego and not contradicting in public.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is used, and not being noise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tag video
- opponent patterns
- preview
- bench tablet
- tactical reports
- dressing room
- changes
- data noise
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Mason
15%
#607 / 623
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112