Automation index
How much of a Tactical analyst’s job can AI already do?
A clip comes earlier. The manager using it, and it not being noise, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tactical analyst
27%
AI can already do 27% of this job.
#137 / 743
View rankingTactical analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Video, tags and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Opponent, patterns and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Preview, the dressing room and not drowning them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Live, the tablet and the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The manager, the ego and not contradicting in public.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is used, and not being noise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tag video
- opponent patterns
- preview
- bench tablet
- tactical reports
- dressing room
- changes
- data noise
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142