Automation index
How much of a Tailor’s job can AI already do?
A pattern comes earlier. Fitting, marking and hanging on the body do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tailor
19%
AI can already do 19% of this job.
#532 / 633
View rankingTailor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pattern, measures and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cut, tack and the shoulder that will not hang.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, mark and the client who loses weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Buttonholes, lining and the hand finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The groom, the deadline and not rushing the hem.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Hang on the body, and not leaving a high shoulder.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- take measures
- patterns
- tack
- buttonholes
- tailor fittings
- linings
- hem
- shoulder
Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142