Automation index
How much of a Tailor’s job can AI already do?
A pattern comes earlier. Fitting, marking and hanging on the body do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tailor
19%
AI can already do 19% of this job.
#653 / 763
View rankingTailor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pattern, measures and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cut, tack and the shoulder that will not hang.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, mark and the client who loses weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Buttonholes, lining and the hand finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The groom, the deadline and not rushing the hem.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Hang on the body, and not leaving a high shoulder.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- take measures
- patterns
- tack
- buttonholes
- tailor fittings
- linings
- hem
- shoulder
Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165