IS WORK OVER?

Automation index

How much of a Tailor’s job can AI already do?

A pattern comes earlier. Fitting, marking and hanging on the body do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tailor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pattern, measures and the fitting.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cut, tack and the shoulder that will not hang.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, mark and the client who loses weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Buttonholes, lining and the hand finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The groom, the deadline and not rushing the hem.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hang on the body, and not leaving a high shoulder.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • take measures
  • patterns
  • tack
  • buttonholes
  • tailor fittings
  • linings
  • hem
  • shoulder

Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 632Dance teacher19%
  2. 633Maxillofacial prosthetist19%
  3. 634Furniture restorer19%
  4. 636Milliner19%
  5. 637Well driller19%
  6. 638Woodcarver19%