Automation index
How much of a Tailor’s job can AI already do?
A pattern comes earlier. Fitting, marking and hanging on the body do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tailor
19%
AI can already do 19% of this job.
#653 / 763
View rankingTailor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pattern, measures and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cut, tack and the shoulder that will not hang.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, mark and the client who loses weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Buttonholes, lining and the hand finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The groom, the deadline and not rushing the hem.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Hang on the body, and not leaving a high shoulder.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- take measures
- patterns
- tack
- buttonholes
- tailor fittings
- linings
- hem
- shoulder
Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531
IS WORK OVER?
HVAC engineer
27%
#178 / 763
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149