Automation index
How much of a Tailor’s job can AI already do?
A pattern comes earlier. Fitting, marking and hanging on the body do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tailor
19%
AI can already do 19% of this job.
#532 / 633
View rankingTailor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pattern, measures and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cut, tack and the shoulder that will not hang.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, mark and the client who loses weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Buttonholes, lining and the hand finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The groom, the deadline and not rushing the hem.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Hang on the body, and not leaving a high shoulder.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- take measures
- patterns
- tack
- buttonholes
- tailor fittings
- linings
- hem
- shoulder
Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131