IS WORK OVER?

Automation index

How much of a Tailor’s job can AI already do?

A pattern comes earlier. Fitting, marking and hanging on the body do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tailor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pattern, measures and the fitting.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cut, tack and the shoulder that will not hang.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, mark and the client who loses weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Buttonholes, lining and the hand finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The groom, the deadline and not rushing the hem.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hang on the body, and not leaving a high shoulder.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • take measures
  • patterns
  • tack
  • buttonholes
  • tailor fittings
  • linings
  • hem
  • shoulder

Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Analyse my job

Jobs with similar scores

  1. 529TV presenter19%
  2. 530Dance teacher19%
  3. 531Furniture restorer19%
  4. 533Milliner19%
  5. 534Well driller19%
  6. 535Woodcarver19%