Automation index
How much of a Talent scout’s job can AI already do?
A stock report comes earlier. Seeing the player without falling for the goal do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Talent scout
27%
AI can already do 27% of this job.
#170 / 623
View rankingTalent scout
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Match, notes and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
See them live, the setting and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data, GPS and not trusting the clip alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Network, agents and the one already promised.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The club, the rush and not inflating the average.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
See the player, and not falling for the goal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scout reports
- see live
- player GPS
- agents
- scout network
- data
- clips
- the player’s setting
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142