Automation index
How much of a Tattoo artist’s job can AI already do?
A sketch and a booking come earlier. Needle, skin, and the client wearing it for 40 years do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tattoo artist
16%
AI can already do 16% of this job.
#722 / 743
View rankingTattoo artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketches, stencils and portfolio.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bookings, consent and written aftercare.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
Tattoo: line, shade and pain.EstimateNo public source provides a precise figure. This is our estimate. | 26% | 4% | +1 |
Hygiene, sterilisation and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 8% | +1.3 |
Advise, cut the design and say no.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Shop brand and aftercare in person.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Sketches, stencils and portfolio
- Bookings, consent and written aftercare
- Tattoo: line, shade and pain
- Hygiene, sterilisation and waste
- Advise, cut the design and say no
- Shop brand and aftercare in person
- tatuador
- tattoo
- tatuaje
Sources for this job· O*NET 27-1019.00· ESCO/ISCO 5142
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142