Automation index
How much of a Tax inspector’s job can AI already do?
A data match comes earlier. Sitting across from the taxpayer and signing the adjustment do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tax inspector
28%
AI can already do 28% of this job.
#104 / 623
View rankingTax inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Data matching, returns and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Requests, minutes and the proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The visit, the second till and what is not in the sheet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Objections, appeals and the tax tribunal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The team, deadlines and the file that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
A fair adjustment and signing the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- match tax data
- raise assessments
- request papers
- visit taxpayers
- adjust tax
- objections
- tax tribunal
- tax inspection
Sources for this job· O*NET 13-2081.00· ESCO/ISCO 3352
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142