Automation index
How much of a Tax inspector’s job can AI already do?
A data match comes earlier. Sitting across from the taxpayer and signing the adjustment do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tax inspector
28%
AI can already do 28% of this job.
#104 / 753
View rankingTax inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Data matching, returns and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Requests, minutes and the proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The visit, the second till and what is not in the sheet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Objections, appeals and the tax tribunal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The team, deadlines and the file that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
A fair adjustment and signing the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- match tax data
- raise assessments
- request papers
- visit taxpayers
- adjust tax
- objections
- tax tribunal
- tax inspection
Sources for this job· O*NET 13-2081.00· ESCO/ISCO 3352
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165