IS WORK OVER?

Automation index

How much of a Tax inspector’s job can AI already do?

A data match comes earlier. Sitting across from the taxpayer and signing the adjustment do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tax inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data matching, returns and sampling.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Requests, minutes and the proposal.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The visit, the second till and what is not in the sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Objections, appeals and the tax tribunal.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The team, deadlines and the file that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
A fair adjustment and signing the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • match tax data
  • raise assessments
  • request papers
  • visit taxpayers
  • adjust tax
  • objections
  • tax tribunal
  • tax inspection

Sources for this job· O*NET 13-2081.00· ESCO/ISCO 3352

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 101Tour guide28%
  2. 102Industrial engineer28%
  3. 103Site reliability engineer28%
  4. 105Inventory clerk28%
  5. 106Store manager28%
  6. 107Government lawyer28%