Automation index
How much of a Tax lawyer’s job can AI already do?
An appeal comes earlier. Fighting the assessment without signing what the tax office will not swallow do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tax lawyer
27%
AI can already do 27% of this job.
#131 / 733
View rankingTax lawyer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assessment, the file and the appeal.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Inspection, the minute and not lying about the fact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
TEAR, the hearing and the precedent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Constitutional, the one that will not fly and not selling it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not building a dodge.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Fight it, and not signing what will not be swallowed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tax appeals
- assessments
- inspection minutes
- TEAR
- precedents
- tax dodges
- the tax office
- facts
Sources for this job· O*NET 23-1011.00· ESCO/ISCO 2611
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142