Automation index
How much of a Taxidermist’s job can AI already do?
A form comes earlier. Mounting the animal without smell or hair slip do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Taxidermist
21%
AI can already do 21% of this job.
#517 / 733
View rankingTaxidermist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Skin, tan and the form.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Mount, set the eyes and the expression.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Drying, pests and the hair that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Client, the trophy and what you cannot do.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
CITES, the permit and not mounting the illegal.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No smell, and the hair in place.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tan skins
- mount trophies
- forms
- CITES
- hair
- expression
- mount pests
- permits
Sources for this job· O*NET 27-1012.00· ESCO/ISCO 3431
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142