IS WORK OVER?

Automation index

How much of a Teaching assistant’s job can AI already do?

A worksheet and a support note come earlier. Sitting with the one who is stuck does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Teaching assistant

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prepare materials and adaptations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Support in class, playground and dining hall.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Accompany SEN and small mediation.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Notes to the teacher and incident log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, copies and classroom order.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not labelling and not leaving a child alone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • Prepare materials and adaptations
  • Accompany SEN and small mediation
  • Notes to the teacher and incident log
  • Stock, copies and classroom order
  • auxiliar docente
  • teaching assistant

Sources for this job· O*NET 25-9042.00· ESCO/ISCO 5312

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 439Network technician21%
  2. 440Orthopaedic surgeon21%
  3. 441Urologist21%
  4. 443Plastic surgeon20%
  5. 444Tow-truck driver20%
  6. 445Private-hire driver20%