IS WORK OVER?

Automation index

How much of a Teaching assistant’s job can AI already do?

A worksheet and a support note come earlier. Sitting with the one who is stuck does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Teaching assistant

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prepare materials and adaptations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Support in class, playground and dining hall.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Accompany SEN and small mediation.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Notes to the teacher and incident log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, copies and classroom order.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not labelling and not leaving a child alone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • Prepare materials and adaptations
  • Accompany SEN and small mediation
  • Notes to the teacher and incident log
  • Stock, copies and classroom order
  • auxiliar docente
  • teaching assistant

Sources for this job· O*NET 25-9042.00· ESCO/ISCO 5312

Corrosion engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Thicknesses, the map and the coupon.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the pipe and the one that is thin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cathode, the protection and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shutdown, the coating and not painting over rust.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the rush and not leaving the thin one in service.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop before it goes, and not painting over it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thicknesses
  • corrosion maps
  • cathodic protection
  • coatings
  • thin pipes
  • shutdowns
  • rust
  • coupons

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 527Network technician21%
  2. 528Orthopaedic surgeon21%
  3. 529Urologist21%
  4. 531Plastic surgeon20%
  5. 532Tow-truck driver20%
  6. 533Private-hire driver20%