IS WORK OVER?

Automation index

How much of a Technical writer’s job can AI already do?

A doc skeleton comes earlier. A human installing the product without ringing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Technical writer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structure, API docs and the tutorial.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Screenshots, versions and not leaving the old shot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The engineer who will not write, and extracting the how.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Legal review, i18n and the changelog.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Support, the tickets and what the doc misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be installed, and not documenting thin air.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • document APIs
  • product tutorials
  • screenshots
  • changelogs
  • extract knowledge
  • docs i18n
  • version review
  • support tickets

Sources for this job· O*NET 27-3042.00· ESCO/ISCO 2641

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 112Route planner28%
  2. 113Psychologist28%
  3. 114Parts clerk28%
  4. 116Land registrar28%
  5. 117Delivery driver28%
  6. 118Secretary28%