IS WORK OVER?

Automation index

How much of a Technical writer’s job can AI already do?

A doc skeleton comes earlier. A human installing the product without ringing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Technical writer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structure, API docs and the tutorial.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Screenshots, versions and not leaving the old shot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The engineer who will not write, and extracting the how.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Legal review, i18n and the changelog.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Support, the tickets and what the doc misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be installed, and not documenting thin air.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • document APIs
  • product tutorials
  • screenshots
  • changelogs
  • extract knowledge
  • docs i18n
  • version review
  • support tickets

Sources for this job· O*NET 27-3042.00· ESCO/ISCO 2641

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 112Route planner28%
  2. 113Psychologist28%
  3. 114Parts clerk28%
  4. 116Land registrar28%
  5. 117Delivery driver28%
  6. 118Secretary28%