IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

District heating engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balance, flows and the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Chamber, the leak and the one that weeps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Substation, the valve and the one that will not open.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Winter, the last block and not leaving it cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the tariff and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the heat arrives, and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • heat balances
  • flows
  • network losses
  • chambers
  • heat substations
  • the last block
  • tariffs
  • leaks

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 271Petroleum engineer25%
  2. 272Production engineer25%
  3. 273Robotics engineer25%
  4. 275Electrical engineer25%
  5. 276Electronics engineer25%
  6. 277Geological engineer25%