IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Diving instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, tables and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Water, the student and the one who panics.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Drills, the regulator and the one who is out of air.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Log, certification and not giving the star away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The current, the vis and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come up whole, and not skipping the stop.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive briefing
  • tables
  • regulator
  • certify divers
  • current
  • visibility
  • stops
  • nervous students

Sources for this job· O*NET 25-3021.00· ESCO/ISCO 3422

Analyse my job

Jobs with similar scores

  1. 232Petroleum engineer25%
  2. 233Production engineer25%
  3. 234Robotics engineer25%
  4. 236Electrical engineer25%
  5. 237Electronics engineer25%
  6. 238Geological engineer25%