Automation index
How much of a Telecom engineer’s job can AI already do?
A link and a sizing come earlier. A network that survives a match night does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Telecom engineer
25%
AI can already do 25% of this job.
#241 / 653
View rankingTelecom engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Size, simulate and plan radio and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Projects, permits and sites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, measurements and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incidents, NOC and operators.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, spectrum and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a town dark from a mistake.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Size, simulate and plan radio and fibre
- Projects, permits and sites
- Field, measurements and commissioning
- Incidents, NOC and operators
- Rules, spectrum and documentation
- Not leaving a town dark from a mistake
- ingeniero de telecomunicaciones
- telecom engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153
IS WORK OVER?
Doula
19%
#508 / 653
View rankingDoula
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, expectations and what cannot be.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Labour, the house and the one that runs long.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Delivery room, the position and the one who asks for an epidural.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Puerperium, the breast and the come-down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The midwife, the line and not playing clinician.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there, and not replacing the midwife.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- birth plan
- labour support
- puerperium
- breastfeeding
- positions
- delivery room
- not replace the midwife
- expectations
Sources for this job· O*NET 31-9099.00· ESCO/ISCO 5322