IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Electoral officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roll, additions and the one who is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Station, the chair and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Polling day, the incident and the one who protests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Count, the minute and not jumping a result.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The board, the complaint and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the right one votes, and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • electoral roll
  • stations
  • ballot boxes
  • the count
  • minutes
  • incidents
  • polling day
  • roll additions

Sources for this job· O*NET 13-1199.00· ESCO/ISCO 3359

Analyse my job

Jobs with similar scores

  1. 263Petroleum engineer25%
  2. 264Production engineer25%
  3. 265Robotics engineer25%
  4. 267Electrical engineer25%
  5. 268Electronics engineer25%
  6. 269Geological engineer25%