IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Fire investigator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Scene, the origin and not treading it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cause, the short and the rag.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sample, the lab and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the insurer and not selling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The judge, the hearing and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Call the cause, and not selling it to the insurer.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fire origin
  • shorts
  • rags
  • samples
  • expert reports
  • insurers
  • the scene
  • not tread

Sources for this job· O*NET 33-2021.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 263Petroleum engineer25%
  2. 264Production engineer25%
  3. 265Robotics engineer25%
  4. 267Electrical engineer25%
  5. 268Electronics engineer25%
  6. 269Geological engineer25%