Automation index
How much of a Telecom engineer’s job can AI already do?
A link and a sizing come earlier. A network that survives a match night does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Telecom engineer
25%
AI can already do 25% of this job.
#235 / 633
View rankingTelecom engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Size, simulate and plan radio and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Projects, permits and sites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, measurements and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incidents, NOC and operators.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, spectrum and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a town dark from a mistake.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Size, simulate and plan radio and fibre
- Projects, permits and sites
- Field, measurements and commissioning
- Incidents, NOC and operators
- Rules, spectrum and documentation
- Not leaving a town dark from a mistake
- ingeniero de telecomunicaciones
- telecom engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153
IS WORK OVER?
Fisher
15%
#626 / 633
View rankingFisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Catch logs, quotas and fishing GPS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 32% | +4.5 |
Logged boat maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Go out, set, haul and stow.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Read the sea, the gear and the school.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Safety, storm and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Market, price and crew life.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Catch logs, quotas and fishing GPS
- Logged boat maintenance
- Go out, set, haul and stow
- Read the sea, the gear and the school
- Safety, storm and fatigue
- Market, price and crew life
- pescador
- fisher
- pesquero
Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6222