IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Heritage interpreter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Script, the group and the time.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Room, the question and the one who will not listen.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The piece, the context and not making it up.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
School group, the yard and getting them to touch carefully.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The director, capacity and not overcrowding.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they look at the stone, and not just the phone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tour scripts
  • school groups
  • pieces
  • historical context
  • capacity
  • not make it up
  • heritage
  • guided visits

Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621

Analyse my job

Jobs with similar scores

  1. 247Petroleum engineer25%
  2. 248Production engineer25%
  3. 249Robotics engineer25%
  4. 251Electrical engineer25%
  5. 252Electronics engineer25%
  6. 253Geological engineer25%