IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Instructional designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Aim, the storyboard and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot, the learner and what is not understood.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Activity, the feedback and not putting a silly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
LMS, the figure and not inflating completion.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the deadline and not cutting the practice.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That they learn, and not leaving the empty video.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • course storyboard
  • modules
  • learner pilot
  • activities
  • LMS
  • completion
  • feedback
  • not a silly test

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 256Petroleum engineer25%
  2. 257Production engineer25%
  3. 258Robotics engineer25%
  4. 260Electrical engineer25%
  5. 261Electronics engineer25%
  6. 262Geological engineer25%