IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Lift technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnosis, codes and the lift history.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Shaft, pit and the cabin rescue.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, tensioning and the industry report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Modernise, doors and the limit switch.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The residents, the porter and the night fault.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the person out, and sign the service.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin rescue
  • service lifts
  • tension cables
  • fault codes
  • shaft pit
  • cabin doors
  • industry report
  • modernise lifts

Sources for this job· O*NET 47-4021.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 232Petroleum engineer25%
  2. 233Production engineer25%
  3. 234Robotics engineer25%
  4. 236Electrical engineer25%
  5. 237Electronics engineer25%
  6. 238Geological engineer25%