IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

National police officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
File, steps and the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Street, ID and the one who runs.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Home, the entry and not overstepping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Statement, the lawyer and not pushing extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The judge, the warrant and not planting anything.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Identify, and not planting evidence.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • case files
  • ID checks
  • entries and searches
  • steps
  • warrants
  • statements
  • not plant evidence
  • deadlines

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5412

Analyse my job

Jobs with similar scores

  1. 259Petroleum engineer25%
  2. 260Production engineer25%
  3. 261Robotics engineer25%
  4. 263Electrical engineer25%
  5. 264Electronics engineer25%
  6. 265Geological engineer25%