IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Pesticide applicator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, product and the dose.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Apply, drift and the wind that gets up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The withholding period and the one who wants in now.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
PPE, the container and the collection point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The neighbour, the bees and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not taking the river, and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm log
  • pesticide dose
  • drift
  • withholding period
  • PPE
  • empty containers
  • bees
  • field wind

Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 232Petroleum engineer25%
  2. 233Production engineer25%
  3. 234Robotics engineer25%
  4. 236Electrical engineer25%
  5. 237Electronics engineer25%
  6. 238Geological engineer25%