IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

SCADA technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screen, tags and the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the PLC and the one that will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Historian, the gap and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Network, the port and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shift, the doubt and not hiding the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they see the alarm, and not dressing the historian.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SCADA screens
  • alarms
  • historian
  • tags
  • ports
  • field PLC
  • not leave ports open
  • shifts

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 3114

Analyse my job

Jobs with similar scores

  1. 268Petroleum engineer25%
  2. 269Production engineer25%
  3. 270Robotics engineer25%
  4. 272Electrical engineer25%
  5. 273Electronics engineer25%
  6. 274Geological engineer25%