IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Sterile processing technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Intake, the dirty and the count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Wash, the ultrasonic and what is left.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Pack, the indicator and the set.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Autoclave, the load and the cycle that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Theatre, the rush and not sending a wet set.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Truly sterile, and not mixing the dirty.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • autoclave
  • surgical sets
  • biological indicators
  • ultrasonic wash
  • sterile pack
  • instrument count
  • steam cycles
  • not mix dirty

Sources for this job· O*NET 31-9093.00· ESCO/ISCO 3213

Analyse my job

Jobs with similar scores

  1. 238Petroleum engineer25%
  2. 239Production engineer25%
  3. 240Robotics engineer25%
  4. 242Electrical engineer25%
  5. 243Electronics engineer25%
  6. 244Geological engineer25%