IS WORK OVER?

Automation index

How much of a Telecom engineer’s job can AI already do?

A link and a sizing come earlier. A network that survives a match night does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Thesis supervisor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, chapters and the calendar.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Draft, the comment and the one who will not rewrite.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Data, ethics and not signing what was not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Deposit, the board and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The department, the rush and not swallowing plagiarism.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the thesis exists, and not signing plagiarism.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thesis chapters
  • drafts
  • data ethics
  • deposit
  • the board
  • plagiarism
  • doctoral calendar
  • rewrite

Sources for this job· O*NET 25-1081.00· ESCO/ISCO 2310

Analyse my job

Jobs with similar scores

  1. 247Petroleum engineer25%
  2. 248Production engineer25%
  3. 249Robotics engineer25%
  4. 251Electrical engineer25%
  5. 252Electronics engineer25%
  6. 253Geological engineer25%