IS WORK OVER?

Automation index

How much of a Telemarketer’s job can AI already do?

A script comes earlier. Them not hanging up in ten seconds, and not lying, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Telemarketer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Script, queue and the shift.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The call, the no and the one who insults.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Data, GDPR and not pushing extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Target, the bonus and not dressing contacts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The supervisor, quality and not skipping the no.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That they do not hang up, and not lying.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • scripts
  • call queues
  • GDPR
  • targets
  • call quality
  • shifts
  • contacts
  • the no

Sources for this job· O*NET 41-9041.00· ESCO/ISCO 4222

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 218Ombudsman officer27%
  2. 219Dairy technician27%
  3. 220Switchboard operator27%
  4. 222Treasurer27%
  5. 223Trader27%
  6. 224Transcriber27%