Automation index
How much of a Telemarketer’s job can AI already do?
A script comes earlier. Them not hanging up in ten seconds, and not lying, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Telemarketer
27%
AI can already do 27% of this job.
#188 / 623
View rankingTelemarketer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, queue and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the no and the one who insults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data, GDPR and not pushing extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Target, the bonus and not dressing contacts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The supervisor, quality and not skipping the no.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they do not hang up, and not lying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scripts
- call queues
- GDPR
- targets
- call quality
- shifts
- contacts
- the no
Sources for this job· O*NET 41-9041.00· ESCO/ISCO 4222
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142