Automation index
How much of a Telemarketer’s job can AI already do?
A script comes earlier. Them not hanging up in ten seconds, and not lying, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Telemarketer
27%
AI can already do 27% of this job.
#188 / 633
View rankingTelemarketer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, queue and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the no and the one who insults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data, GDPR and not pushing extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Target, the bonus and not dressing contacts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The supervisor, quality and not skipping the no.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they do not hang up, and not lying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scripts
- call queues
- GDPR
- targets
- call quality
- shifts
- contacts
- the no
Sources for this job· O*NET 41-9041.00· ESCO/ISCO 4222
IS WORK OVER?
Insulation installer
22%
#318 / 633
View rankingInsulation installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, thicknesses and the panel list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Fit, seal and the bridge you leave.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Roof, façade and the wind on the scaffold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Barriers, vapour and condensation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The designer, the change and late material.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No bridge, and not crushing the insulation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit insulation
- thermal bridges
- vapour barrier
- thicknesses
- insulated façade
- condensation
- seal panels
- roof
Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124